We can perform large range of excavations and site work. This includes Detention pond excavation up to 12 feet in depth, Perform Cut & Fill operation to a site as necessary, excavate and constructing Building Pads using structural fill material, provide rough and final grading to future paving areas.
We can perform large range of excavations and site work. This includes Detention pond excavation up to 12 feet in depth, Perform Cut & Fill operation to a site as necessary, excavate and constructing Building Pads using structural fill material, provide rough and final grading to future paving areas.
We can perform large range of excavations and site work. This includes Detention pond excavation up to 12 feet in depth, Perform Cut & Fill operation to a site as necessary, excavate and constructing Building Pads using structural fill material, provide rough and final grading to future paving areas.
Perform soil stabilization operation using hydrated lime or fly ash or combination of both. Stabilization process includes mixing the chemical with the soils and breaking the soils to small particles to be able to be compacted and tested and certified by technicians and engineers.
Installing reinforced concrete paving on future roads and parking lots in accordance to the engineering specifications. This includes private and public roads, sidewalks, curbs, wheelchair ramps, median opening and left turn construction.
Constructing all types of commercial foundations for future building. This includes but not limited to Structural Slab, Piers Foundation, Floating Slab, and beam footing foundation.
Installing and constructing sanitary sewer system to serve future development and commercial sites. Our staff and employees are very familiar with Cities' and Counties' codes, which allows us to handle either private and public utilities construction.
Manholes are Pre-fabricated at the manufactory and delivery to the site ready to install. Manholes are fabricated in accordance to governmental and engineering codes. Manholes will be grouted and sealed at points of connection and vacuum tested for any air leaks.
In some situation, pre-casted manhole will be difficult to install. Therefore, we use the method “Cast in Place” where the manhole will be formed using special engineered forms to meet all required dimensions and wall thickness. Then concrete will be delivered to the site to pour the manhole in place.
Installing and constructing sanitary sewer system to serve future development and commercial sites. This includes the installation of RCP, HDPE, PVC, Inlets, Manholes, and connecting to public drainage system.
Galvanized Colligated Metal Pipe (GCMP) are required to be used by Harris County Flood Control whenever drainage system is tying to public bayous and detention ponds.
Storm interceptor is a devise installed to filter the storm water before it drains to the public drainage system. There are several types of interceptors fabricated by various manufacture. Our staff will work with the manufacture to make sure device meet the engineering specification, deliver to site and install in place.
Installing water distribution system to newly developed area. This includes connecting to the public utilities systems and extend service leads to individual homes and building. After system is installed, it will be hydro tested for leaks and chlorinated and disinfected from all bacterial objects.
A&M Contractors is one of the few companies approved by the City of Houston to install meters of various sizes. Any water meter larger than 3” is considered large meter. Large Meters must be installed in concrete vault. Our service to our client includes obtaining the permits for the meter, ordering and calibrating the meter, installation, connection to public water and testing (turnkey).